Krell Industries STUDIO 2 manual Connections

Page 10

CONNECTIONS

How to connect AT&Tcables:

a. Remove the plastic cover from the outside of the AT&T transmitter (located on Transport) and receiver (located on Pro- eessor).

b. Locate the slot on the top of the AT&Treceptacle.

e. Locate the key on the top of the AT&Tcable.

d. Removethe plastic cap from both ends of the fiber optic cable.

e. Slide the cable connector into the AT&Treceptacle with the key sliding into the designated slot.

f. Gently push the connector into place, depressing the internal spring, and twist the outer collar clockwise to secure the con- nection.

PAGE 10

Image 10
Contents Studio 2 Digital to Analog Processor Owners ReferenceIntroduction PAGE2TABL~ of Contents Unpacking Unpacking InstructionsPlacement PlacementAC Power AC Power ConsiderationsConnections Input and Output ConnectionsPAGE8 Digital Source to D/A Processorinterlink Consid Erations Connections Sync Indicator Input Select SwitchingOperation 180 Phase Switching Emphasis LEDOperating Instructions Operation Questions and Answers PAGE16 Questions and Answers Specifications PAGE18Warranty and Service Warranty and Service InformationKrell