Krell Industries STUDIO 2 manual Unpacking Instructions

Page 4

UNPACKING

UNPACKING INSTRUCTIONS

1.Open the box and remove the top layer of foam. The following items will now be visible:

STUDIO 2 D/A Processor AC power cord

Packet containing the Owner's Reference and Warranty Card

NOTE:If any of these items are not included, please contact your

authorized dealer immediately for assistance.

2.Carefully remove the STUDIO 2 from the box. Remove the

protective plastic wrap from the Processor.

NOTE: Save all packing materials. If you must ship your STUDIO2 in the future, repack the unit in its original packaging

to prevent transit damage.

PAGE

Image 4
Contents Studio 2 Digital to Analog Processor Owners ReferenceIntroduction PAGE2TABL~ of Contents Unpacking Unpacking InstructionsPlacement PlacementAC Power AC Power ConsiderationsConnections Input and Output ConnectionsPAGE8 Digital Source to D/A Processorinterlink Consid Erations Connections Sync Indicator Input Select SwitchingOperation 180 Phase Switching Emphasis LEDOperating Instructions Operation Questions and Answers PAGE16 Questions and Answers Specifications PAGE18Warranty and Service Warranty and Service InformationKrell