Installation to Solid Concrete and Cinder Block Wall
WARNING
•When installing Peerless wall mounts on cinder block, verify that you have a minimum of
•Concrete must be 2000 psi density minimum. Lighter density concrete may not hold concrete anchor.
•Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard- ware and components.
2 | Position wall mount assembly (A) at desired position on | 1 |
| |
wall. Use wall mount assembly, making sure that it is | concrete | |||
| level, as a template to mark holes. Drill four 1/4" (6 mm) |
| wall | |
| dia. holes to a minimum depth of |
|
| |
| crete must be 2000 psi density minimum. Insert anchors |
| E | |
| (E) in holes flush with wall as shown in figure 2.4. Place |
| ||
| wall mount assembly over anchors and secure with #14 x |
|
| |
| Drill holes and insert anchors | |||
| figure 2.5. Make sure wall plate is level and tighten all | |||
|
|
| ||
| fasteners. | 2 | A | |
| WARNING | |||
|
|
| ||
• Tighten wood screws firmly, but do not overtighten. | D | E | ||
| Overtightening can damage the screws, greatly |
|
| |
| reducing their holding power. | Place wall plate (A) over anchors and secure with | ||
• | Never tighten in excess of 80 in • lb (9 N.M.). | |||
screws (D) |
|
3
WARNING
• Concrete anchors are not intended for attachment to |
|
|
| ||||
| concrete wall covered with a layer of plaster, drywall, | Tighten all fasteners |
|
| |||
| or other finishing material as shown below. If mounting |
|
| ||||
| to concrete wall covered with plaster/drywall is |
| fig 2.4 |
|
| ||
| unavoidable, plaster/drywall (up to 5/8" thick) must be |
|
| ||||
| SOLIDCONCRETE |
|
| ||||
| counterbored as shown below. Be sure concrete |
|
|
| |||
| anchors do not pull away from concrete when tighten- | CINDER |
| ||||
| ing screws. If plaster/drywall is thicker than |
| BLOCK | ||||
|
|
|
|
| |||
| 5/8", custom fasteners must be supplied by installer. | E |
| ||||
VIEW |
| CORRECT | INCORRECT |
| D |
|
|
A | concrete | A | concrete |
|
| ||
CUTAWAY |
|
|
|
|
|
| |
| plaster/ | plaster/ |
| A |
|
| |
|
| dry wall | dry wall |
|
|
| |
|
|
|
|
| fig 2.5 |
|
|
|
|
|
| 5 of 10 | ISSUED: |