18
ACER G24
4. Assembly and Disassembly Procedures (continued)
Go to cover page
Use a | Unplug 6 lamp cables |
S12 release the | S15 |
(No1~4Hex Nut screws |
|
Size=M3x8;Torque=6.5 0.5KGFxCM). |
|
(No.5 screw size=M3x8; Torque=6.50.5KGFxCM).
2
5
1
43
S16
Use a
S13 No.1~2 screws to lease power plug
(No1~2 screw size=M3x10; Torque=5~7KGFxCM).
Disconnect the FFC cable to the connector of panel.
Use finger to push the lock according to arrow direction then take out the FFC cable
12
Use a
S14 | No.1~4 screws to disassemble the LCD panel |
|
| |
|
|
| ||
| and bracket chassis module. |
| Take out lamp cables right through the | |
| S17 |
| ||
| (No1~4 screw size=M3x6; | square holes and separate the bracket chassis | ||
|
|
| ||
| Torque=2.5 | KGFxCM). |
| module and LCD panel apart. |
|
|
| ||
| 1 | 2 |
|
|
|
|
|
| 1 |
|
|
|
| 2 |
|
|
|
| 3 |
| 3 | 4 |
|
|