INSTALLATION
1.Select an appropriate location for the
2.Run all the necessary wiring to the
3.Plug the supplied 12V DC power supply into the
4.Plug the 12V DC power supply connector into the
5.After verifying that the AC outlet works, unplug the power supply connector.
6.Determine the mounting location for the
7.Make sure the mounting surface is clean.
8.Remove the protective coating from the self- adhesive tape and attach the
9.Run the
10.Locate the IR Connecting Block Snap and Lock Connectors and remove them if they are plugged in.
11.Use a small flathead screwdriver or your thumb to
raise the locking | (White) | (Yellow) | (Black) |
|
|
| |
tabs, exposing the |
|
| (Red) |
|
|
| |
holes on the |
|
|
|
connectors. |
|
| Figure 1 |
12. Insert each wire into |
|
| |
|
|
| |
the appropriate hole |
|
|
|
and snap down the locking tabs. Figure 1 |
13.Insert the smooth side of the connector plug into the smooth side of the IR Connecting Block socket.
14.Connect the
15.Plug the 12V DC power supply connector into the
See installation diagram (page 6).
5