Woods Equipment 2300003 manual Verify Control Movements, Single Lever Control Operation

Page 11

Verify Control Movements

1.Mount loader to tractor: Remove mount pins from loader uprights. Align tractor with loader and slowly drive tractor into loader. Shut off tractor.

2.Connect loader feedline hoses to tractor control valve couplers. See Figure 15.

3.Comply with all safety rules and start the tractor.

4.Mount loader to tractor by activating bucket cylinders to raise or lower the loader uprights into the loader mounts. Slowly advance tractor forward, activating appropriate cylinders to engage loader completely into mounts. Insert mounting pins to secure loader.

5.Place feedline hoses between Hose guide and right loader mount as shown in Figure 17.

6.Check that all tractor hydraulic control lever positions operate the loader movements correctly. See Figure 16.

7.If loader movements do not respond correctly, shut off tractor, relieve pressure, and reconnect properly. Loader control movements must be correct before proceeding.

8.Once all loader functions are correct, start the tractor and operate the loader to check for leaks. Purge any remaining air from the hydraulic system and check oil level.

9.Attach the plastic tie straps (included in kit) every 20-inches around the hoses to keep them tightly bundled and away from contact with the ground or other moving parts on the tractor or loader.

10.Before operating the loader, make sure that the Pre-Delivery, Delivery, and Pre-Operation Check lists in the Loader Operator’s Manual have been completed.

Handle forward - Boom down

Handle forward to limit - Float position

Handle back - Boom up

Handle right -

Dump bucket or attachment (slow)

Handle right to limit -

Dump bucket or attachment (fast)

Handle to left - Rollback bucket or attachment

Figure 16. Single Lever Control Operation

Figure 17. Hose Routing

MAN0572 (Rev. 1/30/2009)

Hydraulic Installation 11

 

 

Image 11
Contents MAN0572 To the Dealer IntroductionSafety Rules SafetyNord-LockWasher Mount InstallationLoader Mount Installation Remove Exhaust BracketInstall Left Mount Install Right MountExhaust Kit Installation Install Exhaust Relocation KitInstall Oscillation Stops Optional Install Grill Guard OptionalGeneral Description Hydraulic InstallationInstall Hose Guide Install Hydraulic FittingsAssemble Hoses Hose AssemblySingle Lever Control Operation Verify Control MovementsLoader Mounting KIT Parts1018219 & 1023597 Hose KIT Exhaust Relocation KIT Appendix Bolt Torque ChartAbbreviations Bolt Size ChartWarranty South Illinois Route Post Office Box Oregon, Illinois