Pelco MRU operation manual Exploded Assembly, ZH10LWSSL

Page 10

4.0 EXPLODED ASSEMBLY

An exploded assembly diagram for the MR4000 is shown in Figure 2. Items noted with an asterisk in the parts list (Table A) are parts used for the MRU mount.

Figure 2. MR4000 Exploded Assembly

Table A. Mechanical Parts List: MR4000/MRU Universal Mounts

Item No.

Qty

Description

Part Number

 

 

 

 

1

2

Bracket, Pan, Side

MR40004100COMP

2

2

Bracket, Monitor

MR40004001COMP

3

1

Bracket, Top, Horizontal*

MRU1001WA

4

2

Arm, Top Side*

MRU1000WA

5

Not used

 

6

1

Pipe Mounting MRU*

MRU4207COMP

7

2

Bolt, 1/2-13 x 3/4 Hex, SS*

ZH1/213X.750CH

8

8

Nut, 1/4-20 Hex, SS*

ZH1/4-20NUTCH

9

4

Bolt, 1/4-20 x 5/8 Hex C/S SS*

ZH1/420X.625CH

10

Not used

 

11

8

Washer, Split Lock 1/4 SS Medium*

ZH1/4LWSSL

12

4

Screw, 10-32 x 1/2 Pan Phil, SS

ZH10-32X.500SPP

13

4

Washer, Split Lock #10, SS Medium

ZH10LWSSL

14

4

Washer, Flat #10, SS

ZH204X436X60C

15

8

Washer, Flat 3/16*

ZH260X562X65C

16

2

Washer, Flat 1/2

ZH515X875X62

 

 

 

 

*Denotes parts used for MRU mount.

6

Pelco Manual C233M-G (8/95)

Image 10
Contents MR4000/MRU Contents List of Tables List of IllustrationsRevision History 12iv Pelco Manual C233M-G 8/95 General Important Safeguards and WarningsProduct and/or manual may bear the following mark Description Monitor Assembly See Figure InstallationMR4000 Assembly Hanger Assembly See FigureMounting the Hanger Assembly Monitor MountingMRU Assembly Instructions Hanger AssemblyExploded Assembly ZH10LWSSLSpecifications Dimension DrawingsWarranty and Return Information Warranty