XDVD710 OPERATION
SCREEN Setup - Touch Screen Calibration
On occasion, the touch screen will have to be calibrated. Follow these steps as described.
Step 1
Step 2
L1
1) Touch top left corner of screen
L2
2) Touch SCREEN setup button
Step 3 & 4
Step 5 & 6
L | |
3 | L |
4 |
3)Touch No in TS Calibration row
4)Then touch Yes
L5
Note: For proper calibration you must touch each pointer for 2 seconds. If pointers are not touched properly, the calibration sequence will start over until the calibration is done correctly.
5)Touch and hold the pointers as indicated on the screen for 2 seconds each
6)Screen will automatically return to MAIN MENU, touch RETURN to exit
28