4.3 DSP Resource Management
Due to the Duende having 4 DSP chips, a minimal amount of resource management should be done when running Duende at high load.
If there are, for example 2 slots free and you wish to load a stereo plug- in, Duende will u nder certain conditions notify you that you are out of DSP resources. This will only happen if the two slots are on different DSP chips as Duende is not able to load a st ereo plug
As you can s ee ab ove, the two rem aining slot s reside on different DSP chips and in this case when you attempt to load a s tereo
The way to handle this is as follows:
1. Save your project/song
2. Close your project/song
3.
When this has been done Duende will be forced to reload all the
7