| 2 | | | |
| 20 | 8 | | 19 |
| 11 | |
| 19 | |
| | |
| | | |
| | | 9 | 23 3/8 X 2” |
| | | |
20 | 30 | | | |
| | | |
11 | 19 | | | |
| | | |
| | | | 24 3/8 X 2-1/2” |
FIGURE 9 | | | | |
STEP 9:
•Route the end of the second CABLE (9) through the slot on the UPRIGHT (2) then SECURELY assemble one 3-1/2” PULLEY (11) to the UPRIGHT (2) using two 3/8 X 2-1/2” BOLTS (24), two 3/8 X 3/8” SPACERS (30), four 3/8” WASHERS (19), and two 3/8” LOCK NUTS (20). (NOTE: The CABLE (9) should be routed between the pulley and the retaining bolt as shown in FIGURE 9.)
•Loop the CABLE (9) around one 3-1/2” PULLEY (11) as shown in FIGURE 9.
•LOOSELY assemble the 3-1/2” PULLEY(11) to the 3/16 X 1-3/4 X 5-1/4” PLATES (8) using one 3/8 X 2” BOLT (23), two 3/8” WASHERS (19), and one 3/8” LOCK NUT (20). See FIGURE 9.
•SECURELY tighten the two 3/8 X 2” BOLTS (23) of the 3/16 X 1-3/4 X 5-1/4” PLATES (8).
| 1/2 | | 1/2 | | 1/2 | | 1/2 | | 1/2 | | | 1/2 |
0 | 1 | 2 | 3 | 4 | 5 | 6 |
10