3/8 X 1 -3/4” | 27 | 12 |
| |
3/8 X 3-3/4” 30 | | |
| 43 | |
| 36 | 24 |
| | 34 |
| | 3 |
FIGURE 17 | | |
STEP 17:
•Refer to cable ILLUSTRATION “A” on page 11 for cable routing while installing pulleys.
•Assemble one 3-1/2” PULLEY (24) between BASE PLATES (3) using one 3/8 X 3-3/4” BOLT (30), two 3/8 X 1” SPACERS (43), one 3/8” LOCK NUT (34) and tighten securely.
•Loosely assemble one 3-1/2” PULLEY (24) between the PULLEY PLATES (12) using one 3/8 X 1-3/4” BOLT (27), and one 3/8” LOCK NUT (34).
•Secure end of LOW CABLE (21) using one 3/8 x 3-3/4 BOLT (30), one 3/8” FLAT WASHER (36) one 3/8” LOCK NUT (34) as shown in FIGURE 17
•Tighten both 3-1/2” PULLEYS (24) located on PULLEY PLATES (12)
| 1/2 | | 1/2 | | 1/2 | | 1/2 | | 1/2 | | | 1/2 | |
0 | | | 1 | | | 2 | | | 3 | | | 4 | | | 5 | | 6 |
| | | | | | | | | | | | | | | | | | | | | | | | |
19