Life Fitness SM80 manual Configuration for 2-3/4 and 3 bolts

Page 7

SM80 Unpacking & Assembly Instructions

Figure 6. Configuration for 2-3/4” and 3” bolts.

3.Bolt on the connecting beam (part 4 from Figure 2) using a 5/8” socket with extension and combination wrench, to the cubes using two of the large 7/16” x 6” bolts, 7/16” washers, and 7/16” nuts, end cap washers and end caps. Figure 7 shows the connected cubes.

3/8” x 3” (4)- bolt top beams together

U

T

T

Remove pulleys from housings to give clearance to socket extension

7/16” x 6” (8)- mount on tops

U

Figure 7. Bolt on the connecting beam, lat tops, tricep tops.

4.Mount the 56” lat tops (part T) to the cells using a 5/8” socket and combination wrench by inserting two of the large 7/16” by 6” bolts using the hardware configuration shown. Mount the 29” tricep tops (part U) to the frame and connecting beam (See Figure 7). Use the hardware configuration shown. You will need to remove the pulleys from the teardrop pulley assemblies to gain clearance for the socket wrench extension. Leave the pulleys out of the housings until the cables have been installed.

7

Image 7
Contents M051-K50-B116 Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contents box 1 on left, box 2 on rightSM80 main components seats and cables removed for clarity AssemblySM80 Unpacking & Assembly Instructions Bolt on the teardrop pulleys Configuration for 2-3/4 and 3 bolts SM80 Unpacking & Assembly Instructions Bolt on the top plate SM80 Unpacking & Assembly Instructions Use a pinch bar to align the seat frame holes to the cubes Removing the pulley bolts Installing the CablesCrossover Cable Routing Low row cable routing LAT Pulldown Cable Routing Tricep Pushdown Cable Routing Hardware Hardware . Assembly PartsHardware . Cable jam nut Hardware . Cables Hardware . Top assemblies Hardware . Floating pulleys Hardware . Weight stack rubber bumpersParts List Floating pulley InstalledHardware installed Pulley hardware