SM80 Unpacking & Assembly Instructions
ASSEMBLY
Figure 2 shows an assembled SM80.
Figure 2. SM80 main components (seats and cables removed for clarity).
1. | Cubes (2) | 5. | Lat tops (2) |
2. | Low row bench (2) | 6. | Tricep top (1) |
3. | Lat bench (2) | 7. | 300 lb. Weight stacks (4) |
4.Connecting beam (1) 8. 190 lb. Weight stacks (4)
1.Place the two weight “cubes” in their “final resting spots.” The cubes will be approximately 11’4” apart as shown in Figure 3.
4