Life Fitness manual Assembly, SM80 main components seats and cables removed for clarity

Page 4

SM80 Unpacking & Assembly Instructions

ASSEMBLY

Figure 2 shows an assembled SM80.

Figure 2. SM80 main components (seats and cables removed for clarity).

1.

Cubes (2)

5.

Lat tops (2)

2.

Low row bench (2)

6.

Tricep top (1)

3.

Lat bench (2)

7.

300 lb. Weight stacks (4)

4.Connecting beam (1) 8. 190 lb. Weight stacks (4)

1.Place the two weight “cubes” in their “final resting spots.” The cubes will be approximately 11’4” apart as shown in Figure 3.

4

Image 4
Contents M051-K50-B116 Materials and Tools Required for Assembly Assembly TimeParts box contents box 1 on left, box 2 on right UnpackingAssembly SM80 main components seats and cables removed for claritySM80 Unpacking & Assembly Instructions Bolt on the teardrop pulleys Configuration for 2-3/4 and 3 bolts SM80 Unpacking & Assembly Instructions Bolt on the top plate SM80 Unpacking & Assembly Instructions Use a pinch bar to align the seat frame holes to the cubes Installing the Cables Removing the pulley boltsCrossover Cable Routing Low row cable routing LAT Pulldown Cable Routing Tricep Pushdown Cable Routing Hardware . Assembly Parts HardwareHardware . Cable jam nut Hardware . Cables Hardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleysParts List Installed Hardware installedPulley hardware Floating pulley