2.Tip: Be careful not to pinch the wires during this step.
Have a second person hold the Upright (1) near the Base (5). Connect the Upper Wire (47) to the Lower Wire (46).
Attach the Upright (1) to the Base (5) with five M8 x 16mm Allen Bolts (39), five SW8 Split Washers (34), and five M8 Flat Washers (33).
2 |
| 39 |
|
| 39 |
|
|
| 34 |
|
|
| |
|
| 33 | 39 |
| 34 | |
|
| 39 | 34 |
| 33 | |
|
| 34 |
|
| 39 | |
| Avoid pinching | 33 |
|
|
| 34 |
|
| 33 |
|
| 33 | |
| the wires during |
|
| 1 |
| |
| this step | 47 |
|
|
| |
|
| 46 |
|
| 5 | |
|
|
|
|
|
3.Attach the Right Handlebar (9) to the Upright (1) with four M8 x 16mm Allen Bolts (39), four SW8 Split Washers (34), and four M8 Flat Washers (33).
Attach the Left Handlebar (10) in the same way.
4.Make sure that all parts are properly tight- ened before you use the vibration platform.
3
10
9
1 | 33 34 | 39 | |
33 34 | 39 | ||
|
6