Spalding M88724C Attach backboard 10 to upper and lower, Yokes 18, Hardware as shown in FIG. D

Page 13

12.

Attach backboard (10) to upper and lower

A.

yokes (18 & 17).

First attach board (10) to upper yoke (17),

 

 

using TWO people to hold the board and

 

ONE person to attach hardware (FIG. A).

 

Use hardware as shown in FIG. B.

 

 

B.

 

Then, hinge board to match up with holes in

 

lower yoke (18), FIG. C, and secure with

 

hardware as shown in FIG. D.

 

 

WARNING!

THREE PEOPLE REQUIRED FOR THIS PROCEDURE. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND/OR PROPERTY DAMAGE.

FIG. A

 

FIG. B

 

 

 

10

 

 

 

 

 

 

 

34

21

21

22

21

21

34

 

 

 

22

 

 

 

 

 

 

 

 

FIG. C

FIG. D

 

10

34

21

21

22

21

21

34

 

 

 

22

 

 

 

 

 

 

 

 

13

10/05

ID# M88724C

Image 13
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Make sure nuts 25 are 2.75 7 cm from top of J-bolts Build drainage hill Side V IEWTypes are Identified With a letter Mounting plate 2 as shown Playing SurfaceCompleted Assembly ID# M88724C 10/05 Lower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket Attach backboard 10 to upper and lower Using TWO people to hold the boardYokes 18 First attach board 10 to upper yokeEnd of the rod 14 as shown Figure a Attach height indicators Apply height indicator labels 32 & 31 to height indicatorsInstall net 4 to rim as shown To lower yoke in areaNing 10/05 ID# M88724C Should be level in all directions Check system leveling. PoleLimited Lifetime Warranty