Spalding M88724C manual Playing Surface, Mounting plate 2 as shown

Page 8

7A.

Rest top of pole (1) on a piece of scrap wood (not included) and line up holes in pole to holes in

 

mounting plate (2) as shown.

WARNING!

THREE PEOPLE REQUIRED FOR THIS PROCEDURE. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND/OR PROPERTY DAMAGE.

2

1

PLAYING SURFACE

SCRAP WOOD

(NOT INCLUDED)

1

PLAYING SURFACE

7B.

Insert bolt (28) through holes in plate and pole and secure with nut (22).

1

28

22

ID# M88724C

10/05

8

Image 8
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Make sure nuts 25 are 2.75 7 cm from top of J-bolts Side V IEW Build drainage hillTypes are Identified With a letter Playing Surface Mounting plate 2 as shownCompleted Assembly ID# M88724C 10/05 Attach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Using TWO people to hold the board Attach backboard 10 to upper and lowerYokes 18 First attach board 10 to upper yokeEnd of the rod 14 as shown Figure a Apply height indicator labels 32 & 31 to height indicators Attach height indicatorsInstall net 4 to rim as shown To lower yoke in areaNing 10/05 ID# M88724C Check system leveling. Pole Should be level in all directionsLimited Lifetime Warranty