Spalding 211789 manual

Page 12

Install rod (12) through holes in bottom pole section (3) and eyebolt (13).

3. Insert pole assembly into tank (8) and through center hole on wheel assembly as shown. Secure pole assembly with anchor strap (56), washer (11), and lock nut (48).

WARNING!

TWO PEOPLE REQUIRED FOR THIS PROCEDURE. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND/OR PROPERTY DAMAGE.

IMPORTANT!:

Smaller holes (11/32"/ .87 cm) of top pole should face toward the front of the system and the warning label should be facing toward the front.

13

12

1

2

3

12

8

13

56

11

48

P/N 211789

02/04

12

Image 12
Contents Portable Basketball System U.S.1-800-558-5234 and Canada Safety Instructions Front Back Before YOU Start Hardware Identifier Bolts & Screws Hardware Identifier NUTS, Washers & Metal Spacers Section a Assemble the Poles Tape Reference Mark Section B Assemble the Base Hammer or Mallet02/04 Page Secure tank struts 14 to pole as shown 02/04 Flange nuts Carefully reposition entire assembly as shown Section C Assemble the Elevator System & Backboard Completed Assembly Completed Assembly Completed Assembly FIG. a Tabs 02/04 Completed Assembly Do not Tighten Hardware Completely 02/04 As shown Clip ARM Clip Body Install net Section D Install Front Cover & Handle Section E Securing the System Height Adjustment Moving System Section F Apply Height and Moving Label