Spalding 211789 manual Section D Install Front Cover & Handle

Page 30

SECTION D: INSTALL FRONT COVER & HANDLE

1. Upright system and fill base (8) with water (approx. 40 gallons) and snap fill cap (54) in place.

54

WARNING!

TWO PEOPLE REQUIRED

FOR THIS PROCEDURE.

FAILURE TO FOLLOW THIS

WARNING COULD RESULT IN

SERIOUS INJURY AND/OR

PROPERTY DAMAGE.

WARNING!

DO NOT LEAVE

ASSEMBLY UNATTENDED

WHEN EMPTY; IT MAY TIP

OVER.

CAUTION!

ADD TWO GALLONS (7.6

LITERS) OF NON-TOXIC

ANTIFREEZE IN SUB-

FREEZING CLIMATES.

2. Attach front cover (50) to hinge tubes (18) using carriage bolts (51) and flange nuts (15) as shown.

50

22

18

 

51

 

P/N 211789

02/04

30

Image 30
Contents Portable Basketball System U.S.1-800-558-5234 and Canada Safety Instructions Front Back Before YOU Start Hardware Identifier Bolts & Screws Hardware Identifier NUTS, Washers & Metal Spacers Section a Assemble the Poles Tape Reference Mark Section B Assemble the Base Hammer or Mallet02/04 Page Secure tank struts 14 to pole as shown 02/04 Flange nuts Carefully reposition entire assembly as shown Section C Assemble the Elevator System & Backboard Completed Assembly Completed Assembly Completed Assembly FIG. a Tabs 02/04 Completed Assembly Do not Tighten Hardware Completely 02/04 As shown Clip ARM Clip Body Install net Section D Install Front Cover & Handle Section E Securing the System Height Adjustment Moving System Section F Apply Height and Moving Label