Spalding 211789 manual Completed Assembly

Page 18

1. Securely rest the assembly on sawhorse. Install pole bracket (36) to top pole as shown (FIG.A) using bolts (38), metal spacers (63) and nuts (22). Reference finished assembly (FIG.B.)

WARNING!

TWO PEOPLE REQUIRED

FOR THIS PROCEDURE.

FAILURE TO FOLLOW THIS

WARNING COULD RESULT IN

SERIOUS INJURY AND/OR

PROPERTY DAMAGE.

38

36

63

FIG.A22

COMPLETED ASSEMBLY

36

63 & 38

22

FIG.B

FLAT SIDE

TOWARDS BASE.

P/N 211789

02/04

18

Image 18
Contents Portable Basketball System U.S.1-800-558-5234 and Canada Safety Instructions Front Back Before YOU Start Hardware Identifier Bolts & Screws Hardware Identifier NUTS, Washers & Metal Spacers Section a Assemble the Poles Tape Reference Mark Section B Assemble the Base Hammer or Mallet02/04 Page Secure tank struts 14 to pole as shown 02/04 Flange nuts Carefully reposition entire assembly as shown Section C Assemble the Elevator System & Backboard Completed Assembly Completed Assembly Completed Assembly FIG. a Tabs 02/04 Completed Assembly Do not Tighten Hardware Completely 02/04 As shown Clip ARM Clip Body Install net Section D Install Front Cover & Handle Section E Securing the System Height Adjustment Moving System Section F Apply Height and Moving Label