7. Fill hole completely with concrete.

1" (2.54 cm)

IMPORTANT!: CONTINUE ON TO NEXT STEP.

DO NOT WAIT FOR CONCRETE TO CURE.

8. Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions several times while concrete is curing.

DRAINAGE HILL

1" (2.54 cm)

 

FILL TO

1" (2.54 cm)

HERE

PLAYING SURFACE

SIDEVIEW

IMPORTANT!: WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO

NEXT STEP. CONCRETE MUST CURE.

7

11/05

ID# 21112201

Image 7
Contents For a 4 10.2 cm square pole Parts List see Parts Identifier Safety Instructions 24 61 cm Fill hole approximately 1/3 full with mixed concrete FIG. a Side View ID# 21112201 11/05 Poles should Have a