11
EVO XCITE ELLIPTICAL TRAINER
ASSEMBLY
STEP 5:
Slide the Hand Rail Frame – Right (42) and the Hand Rail Frame – Left (46) into the Hand Rail Support Upright (44) and secure with M8 x 50mm Bolts (83).
Visit us at: www.evofitness.com
11
EVO XCITE ELLIPTICAL TRAINER
Slide the Hand Rail Frame – Right (42) and the Hand Rail Frame – Left (46) into the Hand Rail Support Upright (44) and secure with M8 x 50mm Bolts (83).
Visit us at: www.evofitness.com