Precor UBK 800 Completing the Console Installation P30 and P20, To complete the installation

Page 35

Installing the Console

33

Completing the Console Installation (P30 and P20)

Before you complete the final installation steps, double-check the connections you have made. Make sure that all cables are fully and securely connected, and that any unneeded cables are tied back properly.

To complete the installation:

1.Feed extra cable back into the neck tube.

2.Tilt the control console backward (toward yourself) until the tab on the top edge of its back plate slides along the top edge of the console mount and the screw holes align properly.

3.Insert the four ⁵₈-inch flat head screws through the holes in the console mount and thread them into the holes in the back plate on the console. Partially tighten the screws using a ⁵₈-inch hex wrench.

4.Line up the two small tabs at the bottom of the console’s back cover with the slots at the bottom of the console case. Insert the tabs into the slots.

5.Insert the two #8–32 x ¹₂-inch Phillips-head screws that you removed earlier into the holes at the top edge of the console’s back cover. Tighten the screws fully.

Important: Use caution not to pinch the cables between the back cover and PVS mounting screw heads.

6.Fully tighten the four mounting screws (partially tightened in step 3) using a ⁵₃₂-inch hex wrench.

Image 35
Contents Page Page Page Intellectual Property Notice Edition InformationTrademark Note Safety Precautions Important Safety InstructionsPage Educating Users Regulatory Notices for the Rfid Module Hazardous Materials and Proper DisposalProduct Recycling and Disposal Industry Canada Radio Frequency Interference RFIFederal Communications Commission, Part Cardiovascular Type Equipment Safety Approvals for Cardiovascular EquipmentRegulatory Notices for Cardiovascular Exercise Equipment European ApplicationsUser’s authority to operate the equipment IEC-320 C13 and C14 plugs Obtaining Service Obtaining Updated DocumentationTable of Contents Commercial Cardiovascular Equipment Limited Warranty Assembling the Exercise Bike To prepare the exercise bike for assemblyTo unpack the bike Unpacking the EquipmentRequired Tools Hardware Kit not to scaleTo prepare the bike for installation of the upright support Installing the Upright Support and CablesSide cover removal Upright support insertion To install the bottle holder Installing the Bottle HolderTo install the handlebars Installing the HandlebarsTo level the unit Making Sure the Unit Is StableBreaking in the Equipment Page Threading the Cable Assembly P80 Installing the ConsoleRemoving the access cover from the P80 console To thread the cable assemblyLocation Connecting Cables P80To connect the television cable Connecting the Television CableConnecting the television cable Connecting the Ethernet and Base Unit Data CablesConnecting the Power Cable Connecting the Heart Rate Sensor CableTo complete the installation Completing the Console Installation P80Threading the Cable Assembly P30 and P20 To thread the cable assembly Connecting Cables P30 Connecting Cables P20 Completing the Console Installation P30 and P20 To verify that the heart rate display is operational Verifying That the Heart Rate Display Is OperationalDaily Cleaning MaintenanceDaily Inspection Storing the Chest Strap Quarterly MaintenanceTo perform quarterly maintenance To move the exercise bike Moving the EquipmentLong-Term Storage Rate of Motion Self-Powered FeaturesInformational Displays Prior to Shutdown Symptoms of a Low BatteryOptional Power Adapter Kit Using the Optional Power AdapterReplacing the Battery Warranty Periods and Coverage Commercial Cardiovascular Equipment Limited WarrantyLimited Warranty Conditions and Restrictions Exclusive Remedies Complete this portion and keep for your records Exclusion of Consequential and Incidental DamagesCommercial Cardiovascular Equipment Limited Warranty Page Page Precor Incorporated