8
STEP 4 (See Diagram 4)
A.) Attach two Ø ¾” x Ø 3/8” Bushings (#29) to the Leg Developer (#12). Attach the Leg Developer to the open bracket on Front Post (#6). Secure it with one M10 x 3 1/8” Allen
Bolt (#35), two ¾” Washers (#40), and one M10 Aircraft Nut (#43).
B.) Insert one Long Foam Tube (#13) and two Foam Tubes (#14) halfway through the holes on
the Front Post and Leg Developer. Push six Foam Rolls (#19) onto the Tubes from both ends. Plug six Foam Roll End Caps (#26) into the ends.
C.) Slide an Olympic Sleeve (#28) onto the weight post on the Leg Developer. Attach a Spring Clip (#30) to the Sleeve.
D.) Attach the Arm Curl Pad (#18) to the Arm Curl Stand (#11). Secure it with two M8 x 5/8” Allen Bolts (#38) and two Ø 5/8” Washers (#41). Insert the Arm Curl Stand into the opening on Front Post. Use the M18 Lock Knob (#27) to lock the Stand in position.
DIAGRAM 4
9