STEP 7 (See Diagram 7 & Cable Loop Diagram)
A.) Attach the 157” Lower Cable (#60) to the opening on the bottom of the Leg Developer (#11).
B.) Attach a Pulley (#62) to the opening. Secure it with one M10 x 2 ½” Allen Bolt (#69), two Ø 7/8” x Ø 5/8” Bushings (#44), and one M10 Aircraft Nut (#83).
C.) Draw the Cable underneath the Pulley to the open bracket on Base Frame (#5).
D.) Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#71), two Ø ¾” Washers (#84), and one M10 Aircraft Nut (#83).
E.) Draw the Cable underneath the Pulley to the opening on the bottom of Front Vertical Frame (#3). Attach a Pulley to the opening. Secure it with on M10 x 2 3/8” Allen Bolt (#70), two Ø 7/8” x ½” Pulley Bushings (#45), and one M10 Aircraft Nut (#83).
F.) Draw the Cable underneath the Pulley then pull the Cable upward to the Angled Floating Pulley Bracket (#25) previously installed in
G.) Draw the Cable around the Pulley then downward to the opening on the Base Frame
| (#5). Repeat B to install another Pulley. |
H.) | Pull the Cable around the Pulley then upward to the Double Floating Pulley Bracket |
| (#23) previously installed in |
| Cable Retainer. Adjust the Cable tension by adjusting this Pulley position on the |
| Brackets. If the tension is too tight then move the Pulley down by one hole. If the |
| tension is too loose then move up one hole. |
I.) | Draw the Cable around the Pulley then pull downward. Attach end of the Cable to a |
| bracket on the Base Frame. Secure it with one M10 x 1” Allen Bolt (#73), two Ø ¾” |
| Washers (#84), and one M10 Aircraft Nut (#83). |
19