STEP 5 (See Diagram 5 & Cable Loop Diagram)
A.) | Attach the 137” Upper Cable (#52) to the open bracket on the front of the Upper |
| Frame (#6). Note: The Ball Stopper on the cable should be underneath the Frame. |
B.) | Attach a Pulley (#28) to the bracket and secure it with one 3/8” x 1 ¾” Allen Bolt |
| (#61), two ∅ 3/8” Washers (#77), and one 3/8” Aircraft Nut (#74). |
C.) | Draw the Cable to the open slot on the Vertical Beam (#4). Install a Pulley to the |
| opening. Align the holes and secure it with one 3/8” x 2 5/8” Allen Bolt (#60), two ∅ |
| ½” Bushings (#71), two ∅ 3/8” Washers (#77), and one 3/8” Aircraft Nut (#74). |
D.) | Draw the Cable over the Pulley then downward. Install a Pulley to the Flat Double |
| Floating Pulley Bracket (#23). Let the Bracket hanging for now. Draw the Cable |
| around the Pulley then upward to the open bracket on the rear of Upper Frame. |
E.) | Install another Pulley then pull the Cable downward to the Weight Holder (#8). |
| Connect the Cable to the Weight Holder with a Hook (#46). |
F.) | Slide two Handle Grips (#39) onto the Lat Bar (#18). Connect the Lat Bar to the |
| Upper Cable with two Hooks (#46) and one |
15