Impex MWM 800 manual See Diagram 7 & Cable Loop Diagram

Page 18

STEP 7 (See Diagram 7 & Cable Loop Diagram)

A.) Attach the 133” Lower Cable (#53) to the opening on the Leg Developer (#17). Attach a Pulley (#28) to the opening. Secure it with one 3/8” x 2 5/8” Allen Bolt (#60), two ½” Bushings (#71), two 3/8” Washers (#77), and one 3/8” Aircraft Nut (#74).

B.) Draw the Cable underneath the Pulley to the open slot on the Vertical Beam (#4). Install another Pulley as described in Step A.

C.) Draw the Cable underneath the Pulley then upward to the Angled Double Floating Bracket (#24) previously installed. Attach a Pulley to the open bracket. Secure it with one 3/8” x 1 ¾” Allen Bolt (#61), two 3/8” Washers (#77), and one 3/8” Aircraft Nut (#74).

D.) Draw the Cable around the Pulley the downward to the open bracket on the Main Base Frame (#2). Install another Pulley.

E.) Draw the Cable around the Pulley then upward to the Flat Double Floating Pulley Bracket (#23) previously installed. Install another Pulley.

F.) Draw the Cable around the Pulley then connect the Cable to the Main Base Frame with two Hooks (#46) and a 9-linked Chain (#49).

G.)Adjust the tension of the Cable Loop System by adjusting the length of the Chain.

17

Image 18
Contents Marcy Home GYM Toll-Free Customer Service Number Mon. Fri a.m. 5 p.m. PST Important Safety Notice Hardware Identifier Page Page Page Page Assembly Instruction Diagram See Diagram Diagram See Diagram Diagram Cable Loop Diagram See Diagram 5 & Cable Loop Diagram See Diagram 6 & Cable Loop Diagram See Diagram 7 & Cable Loop Diagram Diagram Page Parts List ’tyPage Impex INC Info@impex-fitness.com