STEP 11 (See Diagram 11 & Cable Loop Diagram)
A.) Attach the 39” AB Cable (#30) to the opening on the Right Vertical Beam (#2). Attach a Pulley to the opening. Secure the Pulley with one M10 x 2 3/8” Allen Bolt (#79), two
∅5/8” x ½” Pulley Bushings (#58), and one M10 Aircraft Nut (#90).
B.) Pull the AB Cable around the Pulley then downward. Attach the end of Cable to a Chain (#51). Secure the Cable to the Chain with one M10 x 1” Allen Bolt (#78), two ∅ ¾” Washers (#93), and one M10 Aircraft Nut (#90). Let the Chain hanging for now.
C.) Attach the 171” Lower Cable (#27) to the opening on the Leg Developer (#9). Attach a Pulley to the opening. Secure it with one M10 x 2 3/8” Allen Bolt (#79), two ∅ 5/8” x ½” Pulley Bushings (#58), and one M10 Aircraft Nut (#90). Draw the Lower Cable underneath the Pulley through the opening on the Right Seat Support (#8) then to the open bracket on the Right Base Frame (#1).
D.) Attach a Pulley to the bracket. Secure it with one M10 x 2” Allen Bolt (#81), two ∅ ¾” Washers (#93), and one M10 Aircraft Nut (#90).
E.) Draw the Lower Cable underneath the Pulley along the Right Base Frame and through the opening on the Right Vertical Beam (#2) to the second open bracket on the Right Base Frame. Attach a
F.) Pull the Cable underneath the Pulley then upward to the Double Floating Pulley Bracket (#44) previously installed. Repeat Step D above to install a Pulley.
G.)Draw the Cable around the Pulley then pull the Cable downward to the first Bracket on the Right Base Frame. Install another Pulley.
H.) Pull the Cable around the Pulley then upward to the Chain (#51). Connect the Cable to the end of the Chain using a
I.) Check the tightness of the Cable loop system. If the cable loop is too loose, shorten the chain.
20