A.) Attach the two
B.) Remove the
C.) Attach a Pulley (#62) to the left Swivel Bracket and secure it with one M10 x 1 ¾” Allen Bolt (#93), two Ø ¾” Washers (#107), and one M10 Aircraft Nut (#110).
D.) Insert the end of Cable through the left
E.) Attach a Cable Roller (#42) to the left
F.) Attach a Small Pulley (#63) to the opening on the left Upper Side Frame. Secure it with one M10 x 2 ¾” Allen Bolt (#97), two Ø ¾” Washers (#107), and one M10 Aircraft Nut (#110). Draw the Cable around the top of the Small Pulley.
G.) Attach another Small Pulley (#63) to the opening next to the Small Pulley installed in F. Repeat F to install the Small Pulley. Draw the Cable under the Small Pulley to an open
| pulley shaft. |
H.) Attach a Pulley (#62) to the open pulley shaft. Secure it with one M10 x 1 ¾” Allen Bolt | |
| (#93), one Ø ¾” Washer (#107), and one Cable Retainer (#78). |
I.) | Draw the Cable around the Pulley then to an open pulley shaft on Rear Upper Frame (#18). |
| Attach a Pulley to the open shaft. Secure it with one M10 x 2 ¾” Allen Bolt (#97), two Ø ¾” |
| Washers (#107), one Cable Retainer (#78), and one M10 Aircraft Nut (#110). |
J.) | Draw the Cable around the Pulley and to the open bracket on the Rear Upper Frame (#18). |
| Attach a Pulley to the bracket. Secure it with one M10 x 5” Allen Bolt (#99), one Cable |
Retainer (#78), two Ø ¾” Washers (#107), and one M10 Aircraft Nut (#110).
K.) Draw the Cable around the Pulley and downward. Attach a Pulley to a Single Floating Pulley Bracket (#34). Secure the Pulley with one M10 x 2” Allen Bolt (#94), two Ø ¾” Washers (#107), two Cable Retainers (#78), and one M10 Aircraft Nut (#11). Draw the Cable upward to the open bracket one the other side on Rear Upper Frame (#18). Let the Pulley hanging for now.
L.) Remove the Nut and Washer installed in J. Attach a Pulley onto the Allen Bolt (#99), then attach a Cable Retainer (#78) to the Pulley, and secure with the removed Washer and Nut.
M.) Draw the Cable to open shaft on Rear Upper Frame. Repeat I to install a Pulley. N.) Draw the Cable to an open pulley shaft. Repeat H to install a Pulley.
O.) Draw the Cable to the opening on the right Upper Side Frame. Repeat F to install two Small Pulleys #63).
P.) Draw the Cable through the right
Q.)
17