25. Check leveling at this time. Pole should be level in all directions. NOTE: If adjustment is necessary, adjust system by rotating the nuts (2) between mounting plate (3) and pole flange. (Refered to in Step 6.) After system is leveled, completely tighten nuts (7) above pole flange.

 

26. Crank to achieve a rim height of 7’ (2.13 m) from the

 

 

ground. Place a mark on pole at the point where the

 

 

lower support arms intersect pole. Center and apply

 

 

the 7’ (2.13 m) height line on label (35) on the mark

 

 

and wrap around. View height indicator label to

 

35

determine approximate backboard height.

 

 

 

 

 

27.

Apply height adjustment

 

 

 

label (37) to front of pole

 

 

 

as shown.

 

 

 

37

 

 

 

REGULATION

 

 

RIM HEIGHT IS

 

 

10 FEET (3.05 m).

 

 

 

10 feet

 

 

 

(3.05 m)

 

15

01/03

P/N 211560H

Image 15
Contents In-Ground Basketball System 211560H 01/03 Contact Utilities Before Digging 211560H 01/03 Holes in pole must be parallel With playing surface Short END Do this strip last Secure jack brackets To lower holes in pole as shown Rear View 211560H 01/03 01/03 P/N 211560H RIM Assembly & Installation Bottom View Leveling Instructions Feet Height Parts List Item #30 Item #43