Huffy AC4062, AC4052, AC4064, AC4054 manual Contact Utilities Before Digging

Page 3

1. Ensure ground is level with playing

 

 

 

 

surface, then dig pole hole.

 

 

 

 

 

WARNING

 

 

PLAYING

 

 

 

 

SURFACE

 

 

 

 

 

 

 

CONTACT UTILITIES

 

 

 

 

 

BEFORE DIGGING.

 

 

24" (61 cm)

 

 

 

 

 

36" (91.4 cm)

 

 

 

 

 

GROUND

 

 

 

 

SURFACE

2.

Install nut (2) to J-bolt (1)

2

2”

 

2

 

3

 

as shown. Repeat

(5.08 cm)

 

 

 

 

 

 

 

procedure for other three

 

 

 

 

 

J-bolts (1).

 

 

 

 

 

IMPORTANT!

 

 

 

 

 

Make sure nuts are 2”

 

 

 

 

 

(5.08 cm) from top of J-Bolts.

1

 

 

 

 

 

 

 

2

 

 

 

 

 

3. Install threaded ends of J-bolts (1) through holes in

1

 

 

 

mounting plate (3) and secure as shown.

 

 

 

NOTE: Make sure J-bolts (1) are in the illustrated

 

 

 

 

position.

 

 

 

 

 

NOTE: Nuts on the top of plate are used for leveling

 

 

 

 

the pole after system is fully assembled.

 

 

 

 

 

3

 

01/03

P/N 211560H

Image 3
Contents In-Ground Basketball System 211560H 01/03 Contact Utilities Before Digging 211560H 01/03 Holes in pole must be parallel With playing surface Short END Do this strip last Secure jack brackets To lower holes in pole as shown Rear View 211560H 01/03 01/03 P/N 211560H RIM Assembly & Installation Bottom View Leveling Instructions Feet Height Parts List Item #30 Item #43