ProSpot Fitness HG-5 manual Step #6 Mesh Covers & Accessories

Page 7

Instructions for Assembly of the ProSpotfitness® HG-5 (Con’t.)

Step #6 MESH COVERS & ACCESSORIES

1.Referencing Diagrams (1 & 12) first attach the Side Mesh Cover Frames (28 & 29) one side at a time. Set Side Frame on the hooks near the base of the unit. One hook is part (69) and the other hook is on the Rear Bottom Panel (5). Then attach the front top corner of the Side Frame (28 & 29) to the Front Top Panel with M4*16) Screws (116) and M4 Washers (117).

2.To install the Rear Cover Frame (30) you need to temporarily unplug the power cords and then re-feed these power cords thru the grommet hole in the Rear frame after it is installed. To install the Rear Mesh Cover Frame (30) to the back of the unit align the pins of the two Side Frames with the holes in Rear Frame and slide down onto the pins of the Rear Bottom Panel (5). These sometimes are a tight fit because of paint build up on pins and holes.

3.Next find the correct Mesh Cover (150 Left side & 151 Right side) for installation. Starting at the front of the unit stick the Velcro Cover in place and wrap around the back keeping the cover tight. Do not over stretch Mesh material, this will cause wrinkles.

4.As shown in Diagram 10 install the Front Plastic Panel (152).

5.As shown in Diagram 7, drop in Angled Front Panel (130) between the Upper Linking Plate assemblies onto the Front Top Panel and rest it on the Panel Tabs.

6.Weight Storage and Accessory Stand: As shown in Diagram 12 attach the Bottom Rails (40) to the Weight Stand Main Frame (39) using M12*75 Bolts M12 Washers (72) and M12 Nuts. Make sure the curved holders on the Bottom Rails (40) are facing inward toward each other. Tighten bolts securely.

7.Next Assemble the VKR Arm Pads (43 right & 44 left) to the respective VKR Frames (41 right & 42 left) using M8 x 60 Bolts (124), M8 Washers (119). Tighten bolts securely.

8.Next Install the VKR vertical Handles (101) on to the VKR Frames (41 & 42) using M10 x25 Bolts (88) and M10 Washers (119) Note there two positions for these handles.

9.Rubber Bumper Pad (94) goes on Storage Posts before any weights are put on it. Lat Leg Hold Down Bar (21) stores vertically in center hole of Weight Storage Accessory stand.

10.Using the Foot Pump (87) inflate Stability Ball (85) to required firmness. Do not over inflate.

-- 7 --

Image 7
Contents PROSPOTfitness HG-5 Instructions for Assembly of the ProSpotfitness HG-5 Step #2 Main Upper Frame Assembly Step #1 Main Frame AssemblyStep #3 Final Frame Assembly Instructions for Assembly of the ProSpotfitness HG-5 con’tStep #5 Weight Stack Assembly Step #4 Weight BAR AssemblyStep #6 Cable Installation Step #6 Mesh Covers & Accessories HG-5 Diagram Main Frame Assembly HG-5 Diagram Wiring Assembly HG-5 Diagram Main Upper Frame Assembly HG-5 Diagram Top Panel Assembly HG-5 Diagram Weight Stack Diagram HG-5 Diagram Middle Cross Brace Assembly HG-5 Diagram Cable Run Assembly Detail HG-5 Diagram Lat Leg Hold Down Assembly HG-5 Diagram Mesh Panel Frame Assembly HG-5 Diagram Weight Bar & Accessories Assembly Detail Following Rules should be Carfully Followed Touch Sensor Barbell Operation User Instructions for the HG-5 cont’ VKR & Dip Station Exercises Rowing Exercise Leg ExtensionLeg Curl Leg PressLubrication Maintenance ProgramProspot Fitness Fusion HG-5 Parts List 138 Electrical Service Inspection Checklist Trouble Shooting of ProSpot SystemsHow the Patented ProSpot System works Trouble-Shooting con’t Page Warranty & Contact Information