STEP 5 (See Diagram 5 & Cable Loop Diagram)
A.) Attach the 136” Upper Cable (#26) to the front opening on the Upper Frame (#4). NOTE: The Ball Stopper on the Cable needs to be underneath the Frame.
B.) Attach a Pulley (#38) to the forward most opening. Secure it with one M10 x 2 3/8” Allen Bolt (#64), two Ø 1” x ½” Pulley Bushings (#39), and one M10 Aircraft Nut (#72).
C.) Draw the Cable towards the back of the machine to the second opening on the Upper Frame. Repeat Step B above to install a Pulley.
D.) Draw the Cable around the Pulley then pull back to the open bracket on the back of Front Press Base (#6).
E.) Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#63), two Ø ¾” Washers (#70), and one M10 Aircraft Nut (#72).
F.) Draw the Cable around the Pulley then to the opening on the Vertical Frame (#3).
Repeat Step B to install a Pulley.
G.) Draw the Cable over the Pulley and pull the Cable downwards. Attach a Pulley to
  | the upper holes on the two Double Floating Pulley Brackets (#20). Repeat Step E  | 
  | above to install the Pulley. Attach a Pulley to a selected lower hole and repeat  | 
  | Step E to install this Pulley. Let the Brackets hanging just for now.  | 
H.)  | Draw the Cable around the Pulley then pull upwards to the open bracket  | 
  | underneath the Upper Frame. Repeat Step E to install another Pulley.  | 
I.)  | Pull the Cable downwards between the two Guide Rods to the Selector Rod (#16).  | 
  | Securely thread the bolt on the end of the Cable into the Selector Rod.  | 
J.)  | Attach an   | 
  | (#13) to the Chain using a   | 
  | Lat Bar exercise.  |