Assembly
NOTE: Hand tighten bolts and nylon nuts until machine is fully assembled.
| 44 |
|
|
| 21 |
|
|
41 |
|
|
|
|
|
| |
|
| 6 |
|
|
|
|
|
| 26 |
|
| 22 |
|
|
|
|
|
|
|
|
|
| |
13 | 32 |
|
| 27 | 13 | 32 | 22 |
38 |
| 45 | 5 |
| |||
32 |
| 43 | 47 |
|
|
| |
|
|
|
| 27 | |||
|
| 45 |
|
|
| ||
|
|
|
|
|
| ||
|
| 46 |
|
|
| 32 |
|
22 | 35 | 23 | 24 |
| 22 |
| |
30 |
|
|
| ||||
| 4 | 32 | 13 |
|
|
| |
|
|
|
| 31 | 25 | ||
|
|
|
|
|
|
27
34
23
STEP 5:
22 33
Attach the leg developer (#5) between the brackets on the front of the front base ( #4) with one bolt M10X75 (#38), two washers 10 (#43) and a nylon M10 (#45) nut.
Push a roller tube (#13) through the upper and lower holes in the leg developer and through the tube welded to the back of the front base. Push a foam roll onto each side of each tube.
Push the threaded end of the leg developer safety hook (#35) through the small welded tube across the front of the front base secure with one small nylon nut M8 (#46).
Attach the arm curl pad to the arm curl post (#6) with two bolts M8x20 (#41) and two wash- ers 8 (#44). Push the arm curl post down into the top of the front base, adjust and secure with one small knot bolt M12x60mm (#30) installed from behind the front base.
Congratulations!!! You have completed assembly of your
9