AB Soft LS 526 manual Assembly Prep

Page 6

PAGE 5

ASSEMBLY PREPARATION

PRODUCT ASSEMBLY

Assembly Prep:

Important: To ensure ease of product assembly, please verify the size and quantity of all the required assembly hardware by referencing the enclosed parts list and hardware chart.

The assembly process has been broken down into easy to follow stages. Please read and review all instructions carefully. Take time to familiarize yourself with the entire assembly process before proceeding. Assembly Tip: It’s may be helpful to pre-stage the items needed to complete each assembly step.

Assemble the equipment in a clean 4ft. x 6ft. flat area. The same amount of space should be considered for assembled equipment usage.

Do not dispose of any packaging materials until assembly of product is completed.

Tools to assemble the equipment are enclosed with main assembly hardware packaging.

Review and follow the preventative maintenance tips listed in this manual.

If you experience problems with operation of the equipment, carefully review the assembly instructions and make sure all steps were completed.

Make sure to completely fill-out the product registration form & return it within 30-days of purchase.

Please contact us if have additional questions or need service assistance (877.861.2181).

Image 6
Contents Rotary Abdominal / Back Reference LS 526 Assembly Hardware LS 526 Assembly Parts Product Exploded View Assembly Prep Assembly Stage # #11 Button Head Allen Screws Qty #16 Nylon Nuts #17 Plate Spacer #15 Flat Washers Qty #19 End Caps Equipment Maintenance General Terms & Conditions Product Registration Stamp Training LOG Lamar H EALTH, F ITNESS, & S PORTS, LLC