Desa Tech CSBNT, CSPINT Installing LOG SET, Installing ROD and Screen, Stove cavity see Figure

Page 12

INSTALLATION

INSTALLING LOG SET

1.

Set one-piece log on heater base as shown in

Continued

 

Figure 14. Make sure middle section at bot-

Equipment

 

 

tom of log is seated into "U" shaped cutout in

Shutoff Valve

 

 

center of heater base. Log will fit securely on

 

 

 

 

base. IMPORTANT: Make sure log does not

Gas Meter

 

cover any burner ports and does not touch the

 

 

stove cavity (see Figure 14).

 

2.

Fasten back panel to stove with four (4) bolts

 

 

and washers removed in step 4 of Unpacking,

 

 

page 7. Make sure product identification label is

Control Valve

 

located on the outside lower left-hand corner.

3.

Place freestanding stove in desired position

Location

 

being careful not to damage gas connections.

Figure 11 - Checking Gas Joints on

 

Be sure to maintain clearances to combustibles

Natural Gas Unit

 

and wall clearances as outlined on page 8.

 

 

INSTALLING ROD AND SCREEN

1.Insert rod through small rings located at top of screen (see Figure 12).

2.From back of stove, insert rod into hole located inside right front of stove as shown in Figure 13.

3.Slip left side of rod down into slot on inside left front of stove (see Figure 13).

Rod

Rings

Figure 12 - Assembling Rod and Screen

Slot on Inside

Rod with

Hole on Inside

Left Front of

Right

Front of

Screen

Stove

Stove

 

Assembled

 

 

 

 

 

 

One-Piece

Log Set

 

 

Middle Section

 

 

at Bottom of

 

 

Log Set

 

 

Burner

 

 

"U" Shaped

Heater

 

Cutout in

 

Chassis

Base

 

 

 

Figure 14 - Installing One-Piece Stove

 

Log Set

 

 

Burner Porting Areas

One-Piece

(double slotted

rectangular openings

Log Set

 

 

 

Safety

 

 

Pilot

 

 

Location

 

 

Figure 15 - Top View of One-Piece Log

Set on Gas Log Heater

Figure 13 - Installing Screen Into Stove

(View From Back of Stove)

12

www.desatech.com

111487-01D

Image 12
Contents What to do if YOU Smell GAS Models CSBNT, CSBPT, CSPBNT, CSPBPT, CSPINT, CspiptTable of Contents Safety Information Product Identification Local CodesProvide adequate clearances around air openings Product Features AIR for Combustion VentilationDetermining FRESH-AIR Flow for Heater Location Ventilation AIRDetermining if You Have a Confined or Unconfined Space Ventilation Air From Inside BuildingAIR for Combustion Ventilation Unpacking Ventilation Air From OutdoorsInstallation Check GAS TypeClearances to Combustibles Vent-Free Operation Only Minimum Wall and Ceiling Clearances see , Connecting to GAS Supply Installation Items Needed Front View Top ViewPetroleum LP gas Back ViewChecking GAS Connections Test Pressures In Excess Of 1/2 Psig 3.5 kPaTest Pressures Equal To or Less Than 1/2 Psig 3.5 kPa Correct all leaks at onceInstalling LOG SET Installing ROD and ScreenStove cavity see Figure Wall clearances as outlined onFor Your Safety Read Before Lighting Operating HeaterLighting Instructions Cleaning Maintenance Inspecting BurnersBurner Injector Holder and Pilot AIR Inlet Hole LogsBlow air into the primary air holes on the injector holder Replace logs if broken or chipped dime-sized or largerTroubleshooting Observed Problem Possible Cause RemedyDelayed ignition burner Burner orifice clogged Clean burner see CleaningWhen burner is lit Dark residue on logs or inside Improper log placementGas leak. See Warning Statement at topSpecifications Service HintsTechnical Service Replacement PartsIllustrated Parts Breakdown Parts List Stove Body Models CSB SERIES, Cspb Series and Cspi Series Parts Centrals Warranty Information Keep this Warranty
Related manuals
Manual 24 pages 12.15 Kb