Weider 831.159390 Find the Butterfly Cable 85-this is, Trap must be oriented as shown and be

Page 13

CABLE ASSEMBLY

23. Locate and open the parts bags labeled

23

“CABLE ASSEMBLY” and “PULLEYS.”

 

During steps 23 through 58, refer to the

 

CABLE DIAGRAMS on pages 30 and 31 of

 

this manual to verify proper cable routing.

 

Before beginning this section, fully unwind the

 

five Cables and identify the Cables by com-

 

paring the lengths and the ends. The approxi-

 

mate length of each Cable, in inches, is listed

 

after the key number in the drawing.

 

IMPORTANT: While assembling the Cables,

 

do not overtighten the bolts and nuts

 

attaching the pulleys. The pulleys must be

 

able to turn freely.

 

 

85—72.5”

 

86—103”

 

87—148.75”

 

89—209.5”

 

88—243”

24. Find the Butterfly Cable (85)—this is the

24

shortest Cable. Slide one end of the Butterfly

 

Cable onto a 3/8” x 1” Bolt (77). Insert the

 

Bolt through the bracket on the Right Arm

 

(5).Thread a 3/8” Nylon Locknut (42) onto the

 

Bolt, but do not fully tighten it. Leave just

77

enough room for the Cable to pivot.

 

 

85

 

5

 

42

25. Wrap the Butterfly Cable (85) around a 3 1/2”

25

Pulley (82) as shown. Attach the Pulley and a

 

Cable Trap (80) to the bracket on the Leg

42

Press Upright (4) with a 3/8” x 2” Bolt (50)

 

and a 3/8” Nylon Locknut (42). The Cable

82

Trap must be oriented as shown and be

 

positioned to hold the Cable in the groove

 

of the Pulley.

50

 

 

80

 

4

 

85

13

Image 13
Contents SEARS, Roebuck and CO., Hoffman ESTATES, IL Patent Pending Model No Serial NoFull 90 DAY Warranty Table of ContentsImportant Precautions Before YOU Begin DimensionsFollowing Tools not Included are Required for Assembly AssemblyFrame ASSEMBLY-PLASTIC LocknutsDo not fully tighten the Nylon Locknuts Nylon LocknutsFully tighten the Nylon Locknuts Grooves are on the indicated side of each Stack of WeightsLocknut 40. Do not overtighten the Nylon Weight Tubes are in the pin grooves in the upper Weights Nylon Locknuts yet ARM Assembly ARM Assembly ARM Assembly Trap must be oriented as shown and be Find the Butterfly Cable 85-this isPositioned to hold the Cable in the groove Pulley End with Two holes Should be Down Cable Assembly Post Wide Tabs Must be On this Side Cable Assembly Cable Assembly Cable must be routed from the direction shown Find the Press Cable 88. Attach the end Cable Trap is turned to hold the Cable Place Plates 31. The Cable must be routed fromLocknut until step Seat Assembly Cable Assembly Seat AssemblySeat Assembly High Pulley Changing the Weight Setting HOW to USE the Home GYM SystemAdjusting the LEG Press Plate Adjusting the LEG LeverAttaching the AB Strap to the AB Pulley Station Plates Weight Resistance ChartTightening the Cables TROUBLE-SHOOTING and MaintenancePress Cable High Cable Long U Bracket Leg Press-13 Cable DiagramsButterfly Cable Left Arm Right Arm Page Page X 3 1/4 Bolt Qty Description Part LIST-Model NoR0698A Exploded DRAWING-Model NoQUESTIONS?