
3.Attach an Upright (1) to each Base (7) using two Joint Plates (12), four M10 x 80mm Bolts (41), and four M10 Nylon Locknuts (11). Make sure the Uprights are oriented exactly as shown. Do not tighten the Nylon Locknuts yet.
4.Insert a Weight Guide (18) into the indicated hole in each Base (7). Attach the Weight Guides to the Bases using M10 x 75mm Bolts (39), M10 Small Washers (6), and M10 Nylon Locknuts (11). Do not tighten the Nylon Locknuts yet.
5.Press a 25mm Bushing (48) into each end of the Locking Bar (34). Slide the Barbell (35) into the Locking Bar (34).
3  | 
  | 
  | 
1  | 
  | 
  | 
41  | 
  | 
  | 
7  | 1  | 
  | 
12  | 
  | 
  | 
  | 
  | 7  | 
12  | 
  | 
  | 
  | 11  | 
  | 
  | 12  | 
  | 
  | 12  | 
  | 
  | 41  | 
  | 
4  | 
  | 
  | 
18  | 
  | 
  | 
39  | 
  | 
  | 
6  | 7  | 
  | 
  | 
  | |
6  | 
  | 
  | 
11  | 18  | 
  | 
  | 
  | |
  | 11  | 39  | 
  | 6  | |
  | 
  | |
  | 7  | 6  | 
  | 
  | |
5  | 
  | 
  | 
48  | 34  | 
  | 
  | 
  | 35  | 
  | 48  | 
  | 
7