Weider WEBE09140 user manual Name Decal

Page 7

5.Orient the Left Upright (28) as shown and attach it to the left Upright Base (2) with two M8 x 68mm Bolts (24), two M8 Washers (23), and two M8 Nylon Locknuts (22). Note: The Bolts must be attached to the lowest set of holes in the Upright and Upright Base. Make sure the bolt heads fit inside the hexagonal holes in the Upright Base. Attach the Upright so that the name decal is in the indicated location. Do not tighten the Locknuts yet.

Attach the Right Upright (3) to the other Upright Base (2) in the same manner.

6.Attach a Dip Arm (5) to the Right Upright (3) and Upright Base (2) with two M8 x 77mm Bolts (29), a Support Plate (13), and two M8 Nylon Locknuts (22). Do not tighten the Locknuts yet.

Repeat this step with the other Dip Arm (5) and the Left Upright (not shown).

7.Attach the Top Crossbar (7) to a Dip Arm (5) with two M8 x 75mm Bolts (17), two M8 Washers (23), and two M8 Nylon Locknuts (22). Do not tighten the Locknuts yet.

Attach the Top Crossbar (7) to the other Dip Arm (5) in the same manner.

7

5

 

 

 

 

3

 

 

 

28

 

 

 

Name

 

 

 

Decal

 

 

 

2

 

24

 

 

 

 

23

 

 

 

22

2

 

 

23

 

 

6

 

 

 

 

 

3

29

 

 

 

 

22

 

 

 

5

 

13

 

 

 

 

22

2

 

 

 

 

5

7

 

 

 

5

7

 

 

 

22

 

 

 

 

 

23

 

5

23

17

Image 7
Contents Mon.-Fri., 6 a.m.-6 p.m. MST QUESTIONS?Model No. WEBE09140 Serial No Customer HOT LineTable of Contents Important Precautions Before YOU Begin Assembled DimensionsMake Things Easier for Yourself AssemblyRepeat with the other Stabilizer Locknuts yet Name Decal Tighten all of the M8 Nylon Locknuts 22 used in steps Exercise Guidelines Cooling Down Muscle ChartStaying Motivated Thursday Aerobic Exercise Date DateExercise Sets Reps Aerobic ExercisePart Identification Chart Qty Description Part LIST-Model No. WEBE09140R0804A Limited Warranty Ordering Replacement PartsIcon Health & FITNESS, INC., 1500 S W., LOGAN, UT