7.Press a 2” x 3” Inner Cap (58) into the top of the Squat Upright (4). Slide the Squat Upright onto the two indicated 5/16” x 2 1/2”Carriage Bolts (110) in the Long Base (120). Finger tighten a 5/16” Nylon Locknut (86) onto each Carriage Bolt. Do not tight- en the Nylon Locknuts yet.
Press a 2” x 3” Inner Cap (58) into the top of the VKR Upright (5). Slide the VKR Upright onto the two indicated 5/16” x 2 1/2”Carriage Bolts (110) in the Long Base (120). Finger tighten a 5/16” Nylon Locknut (86) onto each Carriage Bolt. Do not tight- en the Nylon Locknuts yet.
8.Attach a Roller (39) and two 5/16” Washers (90) between the indicated set of holes in the Squat Slider (38) with a 5/16” x 3 1/2” Bolt (94), two 5/16” Washers (90), and a 5/16” Nylon Locknut (86) as shown.
Assemble the other three Rollers (39) to the Squat Slider (38) in the same manner.
7 | 58 |
|
|
| |
| 58 |
|
| 5 |
|
| 4 |
|
86 |
|
|
110 | 120 | 86 |
| ||
| 110 |
|
8 |
|
|
| 39 |
|
39 | 38 |
|
86 |
| |
|
| |
| 90 |
|
90 | 90 |
|
94 |
| |
|
| |
90 | 39 |
|
|
|
8