Weider WESY2966.0 user manual Ance system is tipped forward as shown

Page 9

7.

Note: This step may be easier if the resist-

7

 

 

 

 

 

ance system is tipped forward as shown.

 

 

 

 

 

 

 

 

 

 

 

Route the Long Cable (42) around a 90mm

 

 

89

 

 

 

 

 

 

 

 

 

Pulley (38). Attach the Pulley, a Half Guard

Slot

 

 

 

 

 

(37), a Cable Trap (39), an M10 Washer (59),

 

 

37

 

 

and another Half Guard to the Rear Frame (10)

 

 

 

 

 

 

 

 

39

 

 

with an M10 x 52mm Patch Screw (89). Do not

 

 

 

 

 

 

 

38

 

 

fully tighten the Button Bolt. Make sure the

 

 

 

 

10 42

 

59

 

 

90mm Pulley is inserted into the indicated

 

 

 

 

 

 

 

slot in the Rear Frame. Make sure that the

 

37

 

 

 

 

Cable Trap is oriented to hold the Cable in

 

 

 

 

 

the groove of the Pulley.

 

 

 

 

 

8.

Wrap the Long Cable (42) under a 90mm

8

 

 

 

 

 

Pulley (38). Attach the Pulley, a Cable Trap

 

 

 

 

 

 

 

 

 

 

 

(39), and two Half Guards (37) to the Base (2)

 

 

 

 

 

 

with an M10 x 52mm Patch Screw (89) and an

 

 

 

 

 

 

M10 Washer (59). Make sure that the Cable

42

 

 

 

 

 

Trap is oriented to hold the Cable in the

 

 

59

 

 

 

groove of the Pulley.

 

 

 

 

 

 

39

 

 

89

 

 

37

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

37

 

 

 

 

 

38

 

 

 

 

 

2

 

 

 

9.

Attach a Pulley Bracket (17) to the indicated

9

 

 

 

 

 

“U”-channel (18) with an M10 x 132mm Button

 

 

 

 

 

 

 

 

 

 

 

Bolt (72), two M10 Washers (59), and an M10

 

 

 

 

 

 

Nylon Locknut (56).

 

 

 

 

 

 

Wrap the Long Cable (42) over a 90mm Pulley

56

 

 

18

 

 

(38). Attach the Pulley inside the Pulley Bracket

59

 

 

 

 

 

56

 

 

(17) with an M10 x 42mm Button Bolt (71) and

 

 

 

 

71

 

 

 

 

 

 

59

 

 

an M10 Nylon Locknut (56).

 

 

 

 

 

 

 

72

 

 

42

 

17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

38

 

 

 

 

10.

Wrap the Long Cable (42) under a 90mm

10

 

 

 

 

 

Pulley (38). Attach the Pulley, a Cable Trap

 

 

 

 

 

 

 

 

 

 

 

(39), and two Half Guards (37) to the Base (2)

 

 

 

 

 

 

with an M10 x 52mm Patch Screw (89) and an

 

 

 

 

 

 

M10 Washer (59). Make sure that the Cable

 

 

 

 

 

 

Trap is oriented to hold the Cable in the

 

 

42

37

89

 

groove of the Pulley.

 

 

 

 

 

 

 

 

 

Note: The Half Guards (37) attached in this

 

37

 

 

 

 

step will overlap the Half Guards attached in

 

 

 

59

 

step 8.

 

 

 

 

 

 

39 38

 

 

 

2

 

 

 

 

 

 

 

 

 

 

9

 

 

 

 

Image 9
Contents Model No. WESY2966.0 Serial No QUESTIONS?Call TOLL-FREE Mon.-Fri., 6 a.m.-6 p.m. MSTTable of Contents Important Precautions Before YOU Begin Right SideLeft Side Part Identification Chart Make Things Easier for Yourself AssemblySee the inset drawing. Attach the Crossbar Button Screws yetMake sure that the Cable is below the rod Swivel Arm Make sure that the resistance bars are cen Tered in the TrayAnce system is tipped forward as shown Page Second person hold the cable end until step Is completed. Discard the wireGrease Adjustments Adjusting the SeatAdjusting the Resistance Attaching the Pulley Housings Attaching the HandlesAttaching the Squat BAR Cable Diagram Attaching the LEG LeverLong Cable Exercise Guidelines Four Basic Types of WorkoutsPersonalizing Your Exercise Program Qty Description Part LIST-Model No. WESY2966.0Exploded Drawing A-Model No. WESY2966.0 Exploded Drawing B-Model No. WESY2966.0 R0606B Ordering Replacement Parts Limited WarrantyIcon Health & FITNESS, INC., 1500 S W., LOGAN, UT