Whirlpool 3397627C Install Vent System, Install Leveling Legs, Vent System Length

Page 8

Vent System Length

Maximum length of vent system depends upon the type of vent used, number of elbows, and type of exhaust hood. The maximum length for both rigid and flexible vent is shown in the chart.

Vent System Chart

 

Number of

Type

Box/louvered

Angled

 

 

90° elbows

of vent

hoods

hoods

 

 

 

 

 

 

 

 

0

Rigid metal

64 ft. (20 m)

58 ft. (17.7 m)

 

 

 

 

 

 

 

 

1

Rigid metal

54 ft. (16.5 m)

48 ft. (14.6 m)

 

 

 

 

 

 

 

 

2

Rigid metal

44 ft. (13.4 m)

38 ft. (11.6 m)

 

 

 

 

 

 

 

 

3

Rigid metal

35 ft. (10.7 m)

29 ft. (8.8 m)

 

 

 

 

 

 

 

 

4

Rigid metal

27 ft. (8.2 m)

21 ft. (6.4 m)

 

 

 

 

 

 

 

 

 

 

 

 

 

For vent systems not covered by the vent specification chart, see Whirlpool Service Manual, “Exhausting Whirlpool Dryers,” Part No. LIT603197, available from your Whirlpool parts distributor.

If dryer is installed in a confined area, such as a bedroom, bathroom, or closet, provision must be made for enough air for combustion and ventilation. (Check governing codes and ordinances.) See “Recessed Area and Closet Installation Instructions” in the “Location Requirements” section.

Install Vent System

1.Install exhaust hood. Use caulking compound to seal exterior wall opening around exhaust hood.

12" min.

(305 mm)

12" min. (305 mm)

2.Connect exhaust vent to hood. Vent must fit inside exhaust hood. Secure vent to exhaust hood with vent tape.

3.Run exhaust vent to dryer location. Use the straightest path possible. Avoid 90º turns. Use vent tape to seal all joints.

Install Leveling Legs

1.Remove tape from dryer cabinet. Open dryer door and remove tape from dryer drum. (Not all dryer drums are taped.) Remove drying rack, if included. Turn dryer drum counterclockwise to make sure all tape was removed. Wipe drum with damp cloth to remove any dust.

2.Take two cardboard corners from dryer carton and place them on floor in back of dryer. Firmly grasp body of dryer and gently lay it on its back on the cardboard corners.

diamond marking

3.Start to screw legs into holes by hand. Use an adjustable wrench or 1" (25 mm) hex-head socket wrench to finish turning legs until you reach the ridge with the diamond marking.

4.Place a carton corner post from dryer packaging under each of the 2 dryer back corners. Stand the dryer up. Slide the dryer on the corner posts until it is close to its final location. Leave enough room to connect the exhaust vent.

8

Image 8
Contents Installation Instructions Electric Dryer 3397627CTable of Contents Page Tools needed Dryer Dimensions Tools and PartsLocation Requirements Parts suppliedElectrical Requirements Recessed Area and Closet Installation InstructionsMinimum Installation Clearances Recommended Ground Method Direct WireElectrical Connection Venting Requirements Plan Vent SystemVent System Length Install Vent SystemInstall Leveling Legs Check Operation Connect VentLevel Dryer Change Door Swing Page 2011 All rights reserved