INSTRUCTIONS FOR 50 KILO AND 60 KILO PRESS SHIM RETRO-FIT

These instructions are for adding shims under the main bell air cylinder on 50 kilo and 60 kilo presses. Before beginning to add shims below the air cylinder, it is necessary to familiarize yourself with all safety precautions in the equipment's manuals; please observe all safety precautions. It is also imperative that these instructions, including the attached drawing are read and understood before beginning the retrofit. While working on any equipment, tag and lockout the power. Also, inventory the parts received with the kit.

Please read through these instructions thoroughly before beginning implementation of the shims to the main bell air cylinder.

Some of the tools, which will be needed to perform this product enhancement, are as follows: SAE size wrenches, Allen wrenches, lineup pin, and assorted hand tools.

MILNOR will provide installation labor costs for placing shims and replacing the up-lock assembly. We anticipate this labor not to exceed 10 man-hours per machine, i.e. one man at ten hours or two men at five hours each for a total of ten hours per retrofit.

INSTRUCTIONS:

We recommend that a qualified maintenance employee or dealer personnel perform this product enhancement.

1.Using a permanent marker, trace the outline of the main bell air cylinder onto the upper cross-member. This will give an outline for centering the main bell air cylinder onto the upper cross-member at the completion of the project (See Figure 1).

2.Operate the dome from the up position to the down position. As the dome makes contact with the bed, check to see if the dome meets the bed flush or side touches the bed first (the dome is cocked in relation to the bed).

3.Remove the diaphragm from the dome (See Milnor Membrane Press SERVICE Manual).

4.Manually operate the dome to the down position.

5.Loosen the bolts on the coupling, which joins the air cylinder shaft to the top of the dome downlock hub assembly (See Figure 2).

6.Remove this coupling from the shaft.

7.Place the 12 bolt-hole coupler shim on top of the dome downlock hub assembly (with bolt holes properly aligned).

Image 10
Contents KURSPK0025 KURSPK0026 Please Read Setting Limit Switches Setting Switches Right Roller Plunger Switch Angle Press Safety for Installation and Service Page Page Instructions for 50 Kilo and 60 Kilo Press Shim RETRO-FIT Page Page Page Page Example Page HURSPK0026/00186 Torque To Ft-lb HURSPK0026/00186 One of the Four Main Bell Air Cylinder Bolts Main Bell Air Cylinder Shims HURSPK0026/00186 HURSPK0026/00186 Right-Hand Side Lock Shaft Bearing Upper Cross-Member HURSPK0026/00186 Old Setup of Dome Full-Up Contact Switch and Bracket HURSPK0026/00186 HURSPK0026/00186 Page 20 Location of Downlock Shims Lock Ring Bolts