21.Slide as many large shims in the gap between the base and cross-member as possible. If a gap remains between the large shims and the main bell air cylinder, slide as many smaller shims between the large shim and the base of the air cylinder to fill the remaining gap.

The last shim may be a tight fit between the other shims and the base of the air cylinder, so that you may have to tap the shim into place.

22.Remove the stack of shims from underneath the air cylinder. If step (7) of these instructions was implemented then add two more of the thin shims (0.025" / 0.635mm) to the current stack of shims. Use this stack of shims to make three more identical shim stacks.

23.Untag the machine and raise the dome to the “up” position.

24.Add one additional 0.056" (1.4224mm) shim to each of the two sets of shims on the press bed (Refer to Step 12).

25.Lower the dome to the “down” position.

26.With the dome in the “down” position, tag and lockout the power.

27.Remove one of the four nuts and bolts from the main bell air cylinder base where it is connected to the upper cross-member (See Figure 4).

28.Slide one of the four air cylinder shim stacks from Step (22) in between the air cylinder and the upper cross member so that the shim stack lines up with the bolt hole. After the shim stack is in place, place a new longer bolt (included in the kit) through the upper cross member hole, the shims, and the air cylinder. Put the lock washer onto the bolt. Hand tighten the nut onto the bolt (See Figure 5).

29.Repeat steps (27) and (28) for the remaining three bolts of the air cylinder base.

30.Visually check if the uplock brackets are closing fully. If the brackets cannot fully close, then proceed to step (22). If the brackets can close fully then proceed to step (41).

31.When facing the main bell air cylinder from the discharge side of the press, remove the pin from the uplock bracket clevis that is connected to the right-hand uplock assembly bracket. (See Figure 6)

32.Loosen the “bracket clamping bolt” on the right-hand uplock assembly bracket. Do not remove the contact switches from the bracket. Next remove the right-hand lock shaft nut and remove the right-hand bracket (See Figure 6).

33.Remove the spacers on the right-hand lock shaft between the up lock shaft bolt and the upper lock shaft bearing. Note the order of the spacers, they need to be replaced in the same order that they were removed (See Figure 7). Remove the right-hand up lock

10

Image 12
Contents KURSPK0025 KURSPK0026 Please Read Setting Limit Switches Setting Switches Right Roller Plunger Switch Angle Press Safety for Installation and Service Page Page Instructions for 50 Kilo and 60 Kilo Press Shim RETRO-FIT Page Page Page Page Example Page HURSPK0026/00186 Torque To Ft-lb HURSPK0026/00186 One of the Four Main Bell Air Cylinder Bolts Main Bell Air Cylinder Shims HURSPK0026/00186 HURSPK0026/00186 Right-Hand Side Lock Shaft Bearing Upper Cross-Member HURSPK0026/00186 Old Setup of Dome Full-Up Contact Switch and Bracket HURSPK0026/00186 HURSPK0026/00186 Page 20 Location of Downlock Shims Lock Ring Bolts