Usingi process
Steps of using the operation buttons and description of the steps
Minutes | Minutes | Times | Minutes |
|
|
|
|
|
| |
SOAK | WASH | RINSE | SPIN |
|
9 | 10 |
|
|
|
7 | 8 | Time remained(minute) |
|
|
| FIBRE | NORMAL | ||
|
|
| ||
5 | 6 |
| COTTON | QUICK |
|
|
| ||
3 | 4 |
| WOOLLEN | POSTHASTE |
|
| Reserve(hours later) | ||
|
|
|
| |
1 | 2 |
| SILK | JEANS |
|
|
|
WATER | RESERVE | PROGRAM |
LEVEL |
| |
|
|
POWER
STARTON/OFF
PAUSE
Push the "POWER ON/OFF " button to switch on the power.
POWER
ON/OFF
2 Push the "PROGRAM" button to select suitable automatic program.
PROGRAM
After switching on the power, the machine will set normal program automatically. To select other automatic program, push the "program" button till the relative indicator is on. Refer to the "program button" on Page 11 for the selection.
For instance: select "POSTHASTE" program for laundries with small
quantity and light soil.
Page 11
In selecting the normal program, the machine will execute fuzzy program to select water
and wash time according to the cloth and weight of the laundries. The full procedure is controlled automatically.
Fibre | Normal | |
Cotton | ||
Quick | ||
Woollen | ||
Posthaste | ||
Silk | ||
Jeans | ||
|
Push the "SOAK","WASH", "RINSE" or "SPIN" button to select suitable procedure.
Minutes | Minutes | Times | Minutes |
SOAK | WASH | RINSE | SPIN |