GE PTDS650GMWT installation instructions Reconnecting GAS, Leak Test

Page 3

Installation Instructions

3RECONNECTING GAS

Listed connector ANSI Z21.24 / CSA 6.10

FLARE NPT

1/8" NPT PIPE PLUG FOR CHECKING GAS INLET PRESSURE

3/8" NPT

PIPE SIZE

AT LEAST 1/2"

Note: The connector and fittings are designed for use only on the original installation and are not to be reused for another appliance or at another location. Keep flare end of adaptor free of grease, oil and thread sealant. Caution: Use adapters as shown. Connector nuts must not be connected directly to pipe threads.

TIGHTEN ALL CONNECTIONS

USING TWO ADJUSTABLE WRENCHES.

DO NOT OVERTORQUE GAS CONNECTIONS!

4 LEAK TEST

WARNING: NEVER USE AN OPEN

FLAME TO TEST FOR GAS LEAKS.

TIGHTEN THE FLEXIBLE

GAS LINE USING TWO

ADJUSTABLE WRENCHES.

3

Image 3
Contents Read these instructions completely and carefully Before YOU BeginGAS Requirements Preparing for Installation NEW DryerDisconnecting GAS Removing Lint from Wall Exhaust OpeningLeak Test Reconnecting GASElectrical Requirements Exhaust InformationExhaust System Check List Leveling Legs Stand the Dryer Upright Near Exhaust ConnectionLeveling Dryer Standard Rear Exhaust Vented above floor levelConnecting the Dryer To House Vent Rigid Metal Transition DuctMetal FOIL-TYPE Transition Duct Bend TAB Dryer Exhaust to RIGHT, Left or Bottom CabinetTAB Location Adding NEW DuctPlate Remove Hinge Screws Rotate Door ReinstallChanging Direction of Door Opening Adding Cover Plate to Rear of CabinetConnecting Inlet Hoses Water Supply RequirementsServicing