Lumex Syatems AQ2000, AQ1000 user manual Fuse replacement 220V system only, Fuse location, Storage

Page 13

Fuse replacement (220V system only)

tool needed: small screwdriver

1.If you suspect a blown fuse, disconnect the plug from the wall outlet immediately.

fuse

fuse cover

fuse location

2.Use a small screwdriver to remove the cover of the fuse holder (fuse locations are shown in picture above).

3.Insert a new fuse of the correct rating (T1A/250V).

4.Replace the fuse holder cover. Ensure that fuse holder cover is securely installed.

STORAGE

1.Fold the bubble pad loosely.

2.Store bubble pad and pump in a dust-free environment with no exposure to direct sunlight.

AQ1000-INS-LAB-RevD13

13

Image 13
Contents AQ1000 / AQ2000 Contents Introduction Important Safety PrecautionsIntended USE of this Device ContraindicationAQ1000-INS-LAB-RevD13 AQ1000-INS-LAB-RevD13 Equipment Symbols Bubble PAD and Pump System Product DescriptionBubble pad and pump system PumpAQ1000 Front PanelAQ1000 pump front panel AQ2000 AQ2000 pump front panelPump and Bubble PAD Installation InstallationUnpacking AQ1000-INS-LAB-RevD13 Operation AQ2000 only Pressure AdjustmentQuick Disconnect CPR FunctionCleaning MaintenanceGeneral Maintenance PumpFuse location Fuse replacement 220V system onlyStorage Length Pump Unit Size SpecificationsWarranty