Lumex Syatems AQ2000, AQ1000 user manual Unpacking, Pump and Bubble PAD Installation

Page 9

INSTALLATION

UNPACKING

1.Before unpacking, check for obvious damage to the carton or its contents. If damage is evident, please notify the carrier and your Graham-Field authorized distributor.

2.Remove all loose packing from the carton.

3.Carefully remove all components from the carton.

4.Inspect all components. If damage is evident, please notify the carrier and your Graham-Field authorized distributor.

PUMP AND BUBBLE PAD INSTALLATION

1.Remove all sheets, blankets, and pillows from the bed.

2.Place the bubble pad on the bed mattress with the tubing at the patient's feet.

wire hanger

foot end

bubble pad

 

mattress

pump

 

 

(AQ2000 shown)

installation

3.Fold open the wire hangers on the back of the pump as shown above.

4.Use the hangers to hang the pump on the bed's foot end, as shown above; adjust the hangers to place the pump in the most upright position (or place the pump on a flat surface easily accessible to the caregiver and/or doctor).

sNOTICE: Place the device in a position where the caregiver and/or doctor can access it easily.

AQ1000-INS-LAB-RevD13

9

Image 9
Contents AQ1000 / AQ2000 Contents Introduction Important Safety PrecautionsIntended USE of this Device ContraindicationAQ1000-INS-LAB-RevD13 AQ1000-INS-LAB-RevD13 Equipment Symbols Bubble PAD and Pump System Product DescriptionBubble pad and pump system PumpAQ1000 Front PanelAQ1000 pump front panel AQ2000 AQ2000 pump front panelInstallation Pump and Bubble PAD InstallationUnpacking AQ1000-INS-LAB-RevD13 Operation AQ2000 only Pressure AdjustmentQuick Disconnect CPR FunctionCleaning MaintenanceGeneral Maintenance PumpFuse replacement 220V system only Fuse locationStorage Length Pump Unit Size SpecificationsWarranty