Omega Engineering OMR-6510, OMR-6520 manual Install a Brand-New OMR

Page 28

6.Power on the power supply for OMR modules.

7.Use the OMR Administrating utility to configure the address ID, Baud rate and check-sum status of the module.

8.Power of the local power supply.

9.Disconnect the DEFAULT* pin.

10.Configure the OMR-6520 to desired Baud rate.

11.Power on the local power supply

12.Use OMR Administration utility to check the module‘s new setting.

4-2 Install a Brand-New OMR

Image 28
Contents 3581 for Contents Outstanding Features of OMR What is OMR ?Introduction Introduction OMR-6000 series products overview EIA RS-485 StandardOMR RS-485 Network Configurations RS-485 on OMRConstructing a OMR Network Branch TopologyTermination Bus ShieldingHow to Calculate Checksum Value Format of OMR CommandsPage What is OMR-6520 ? Features of OMR-6520OMR-6520 OverviewSpecifications of OMR-6520 ² InputLook at OMR-6520 & Pin Assignment Pin Definitions Connection Between Host and OMR-6520Functional Block Diagram Setup Installation Application wiring of OMR-6520 ProgrammingWhat is OMR-6510 ? Features of OMR-6510Specifications of OMR-6510 OMR-6510Tx+ Rx+ RX TXIN+ OMR-6510 Functional Block Diagram GND SW1OFF Software is not necessary +DATA DATA+ Data Data Page Install a Brand New OMR Initialize a Brand-New OMRInstall a Brand-New OMR Install a New OMR to a Existing Network Initialization WiringEquipments for Install a New Module Installing ProcedurePage Software Installation How to Execute the OMR AdministrationExecute the OMR Administration Utility Software UtilityOMR Administration Function Overview Default RS-232 Communication Port SettingChange RS-232 Communication Port Setting Search all exist OMR modulesUsing Operations Operation-Run Batch Software Utility Save and Print OMR modules’ information Version Information Software Utility Troubleshooting and Maintenance Using the LED Indication