Initialization Wiring
|
|
|
|
| |
|
|
|
|
| |
| Host |
| |||
|
|
|
| Converter | |
| Computer |
|
|
| |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
New
OMR module
Local Power Supply +10 V to +30 V
+Vs GND
DATA +
DATA -
+Vs GND
DATA+
DATA - Default*
+Vs GND
Figure 4-1 Layout for Configuring the OMR module
4.2Install a New OMR to a Existing Network
Equipments for Install a New Module
∙A existing OMR network
∙New OMR modules.
∙DC Power supply (+10 to +30 VDC).
Installing Procedure
1.Configure the new OMR module according the initialization procedure in section 4.1.
2.The baud rate and
3.Power off the OMR local power supply of the existing
4.Power off the host computer.
5.Add the new module to the existing
6.Power on the host computer.
7.Power on the OMR local power supply.
8.Use the OMR administration utility to check entire network.