S/C Yachts SC 420 manual Mast Base, Spreader Length and Marks, Trapeze System

Page 3

Mast Base

The mast step bolt should be in the 6th hole from the back. The rig tension bolt should be in the 3rd hole from the back.

Spreader Length and Marks

The spreader length should be 505mm from side of mast to centre of shroud wire, this is the 5th pin hole position. Mark the spreaders every two cm’s from the centre of the shroud wire, this can be used for the jib trim with regard to the leech settings.

Trapeze System

The trapeze ropes and blocks are pre assembled, in the fitting bag. Once you get them out, shackle them on the trapeze wires and hook them onto the trapeze elastic loops as shown, by feeding the elastic bowline through the hole and over the edge of the ring.

Image 3
Contents Introduction MastRigging Pack Forestay Spinner and Jib Head BoomPole Bow AttachmentsMast Base Spreader Length and MarksTrapeze System Rope Bag Fitting BagJib Sheet Marks Vang Spinnaker Sheets and Spinnaker KnotsMainsheet Centre Case Systems Plastic Rope BallsPole Hook Chocks and Reverse Chocking Compass BracketCentreboard Fastening Sponge and BailerTension Gauge Spare Mylar Wind Indicator ShacklesRudder Stock CoversTrolley Sails Tuning